DOT warning You are accessing a U.S. Government information system. This information system, including all related equipment, networks, and network devices, is provided for U.S. Government-authorized use only. Unauthorized or improper use of this system is prohibited, and may result in civil and criminal penalties, or administrative disciplinary action.
The communications and data stored or transiting this system may be, for any lawful Government purpose, monitored, recorded, and subject to audit or investigation. By using this system, you understand and consent to such terms. View User Behavior Rules

        
Skip Ribbon Commands
Skip to main content

Body

OK clarification - original scope - if a build alternative meeting P&N is selected, enough ROW would be acquired to provide for four through lanes in a constrolled access ROW. However, only two lanes, a Super 2, would be constructed to meet capacity needs for the design year. Sometime after the design year, at a time unknown, it is felt that additional capacity would most likely be required and it would be more cost effective to acquire (and preserve for highway use) forested lands today than residential lands tomorrow, a bit of insightful logic if you will.
Revised scope - project scope is reduced to a smaller footprint to reduce costs, now. 250' ROW to 100' ROW.
ROW to be acquired after NEPA decision. btw, ROW acquisition could be conducted prior to NEPA decision following the regulations at 23 CFR 710.501/503 for early or advance acquisition.

CurrentCategory

NEPA Process and Documentation

Original Author

 

Summary

OK clarification - original scope - if a build alternative meeting P&N is selected, enough ROW would be acquired to provide for four through lanes in a constrolled access ROW. However, only two lanes, a Super 2, would be constructed to meet capacity needs for the design year. Sometime after the design year, at a time unknown, it is felt that additional capacity would most likely be required and it would be more cost effective to acquire (and preserve for highway use) forested lands today than residential lands tomorrow, a bit of insightful logic if you will. Revised scope - project scope is reduced to a smaller footprint to reduce costs, now. 250' ROW to 100' ROW. ROW to be acquired after NEPA decision. btw, ROW acquisition could be conducted prior to NEPA decision following the regulations at 23 CFR 710.501/503 for early or advance acquisition.

Category

NEPA Process and Documentation

Attachments

Content Type: Message
Created at 4/24/2012 8:38 AM by System Account
Last modified at 4/24/2012 8:38 AM by System Account